[{"data":1,"prerenderedAt":381},["ShallowReactive",2],{"navigation":3,"\u002Fdocs\u002Fconstruction-progress-guide":40,"\u002Fdocs\u002Fconstruction-progress-guide-surround":376},[4,8,12,16,20,24,28,32,36],{"title":5,"path":6,"stem":7},"Getting started","\u002Fdocs\u002Fgetting-started","1.docs\u002F1.getting-started",{"title":9,"path":10,"stem":11},"Core concepts","\u002Fdocs\u002Fcore-concepts","1.docs\u002F2.core-concepts",{"title":13,"path":14,"stem":15},"Sales & CRM guide","\u002Fdocs\u002Fsales-crm-guide","1.docs\u002F3.sales-crm-guide",{"title":17,"path":18,"stem":19},"Construction progress guide","\u002Fdocs\u002Fconstruction-progress-guide","1.docs\u002F4.construction-progress-guide",{"title":21,"path":22,"stem":23},"Payments & collections guide","\u002Fdocs\u002Fpayments-guide","1.docs\u002F5.payments-guide",{"title":25,"path":26,"stem":27},"RERA compliance guide","\u002Fdocs\u002Frera-compliance-guide","1.docs\u002F6.rera-compliance-guide",{"title":29,"path":30,"stem":31},"Exports & audit trail","\u002Fdocs\u002Freports-and-exports","1.docs\u002F7.reports-and-exports",{"title":33,"path":34,"stem":35},"Roles & permissions","\u002Fdocs\u002Froles-permissions","1.docs\u002F8.roles-permissions",{"title":37,"path":38,"stem":39},"Frequently asked questions","\u002Fdocs\u002Ffaq","1.docs\u002F9.faq",{"id":41,"title":17,"body":42,"description":370,"extension":371,"meta":372,"navigation":373,"path":18,"seo":374,"stem":19,"__hash__":375},"docs\u002F1.docs\u002F4.construction-progress-guide.md",{"type":43,"value":44,"toc":360},"minimark",[45,50,59,81,88,97,101,108,140,143,147,155,159,162,209,212,216,219,311,314,318,323,326,341,344,348],[46,47,49],"h2",{"id":48},"activity-templates","Activity templates",[51,52,53,54,58],"p",{},"Progress tracking is built on ",[55,56,57],"strong",{},"activity templates",": checklists of construction activities\ngrouped under RERA's standard progress categories (see below). Templates come in three scopes.",[60,61,62,69,75],"ul",{},[63,64,65,68],"li",{},[55,66,67],{},"Phase templates"," cover phase-level infrastructure and common areas, like roads, compound wall,\nlandscaping, and similar shared works that don't belong to one building.",[63,70,71,74],{},[55,72,73],{},"Building templates"," cover building-level structural work, such as excavation, superstructure,\nstaircases and lifts, and external works.",[63,76,77,80],{},[55,78,79],{},"Unit templates"," cover work done inside individual flats or units: internal plaster and\nflooring, sanitary fittings, fixtures.",[51,82,83,84,87],{},"Templates are set up once by an administrator (under Settings → Progress Templates) and then\n",[55,85,86],{},"applied"," wherever tracking needs to start. You don't need to build a checklist from scratch\nfor every phase or building. Pick a template and Construvex creates the progress records for\nyou.",[89,90,91],"blockquote",{},[51,92,93,96],{},[55,94,95],{},"Note:"," Editing the activities inside a template is an admin task. This guide covers using\ntemplates to start tracking progress, not building or editing them.",[46,98,100],{"id":99},"initializing-progress-tracking","Initializing progress tracking",[51,102,103,104,107],{},"Before you can record any progress, a phase, building, or unit needs to be ",[55,105,106],{},"initialized"," from a\ntemplate:",[109,110,111,122,137],"ol",{},[63,112,113,114,117,118,121],{},"Open the phase's ",[55,115,116],{},"Phase progress"," page (or a building's ",[55,119,120],{},"Building progress"," page).",[63,123,124,125,128,129,132,133,136],{},"If nothing has been tracked yet, you'll see an initializer prompting you to pick a template:\na ",[55,126,127],{},"Phase Infrastructure Template"," for phase-level common works, or a ",[55,130,131],{},"Building Template","\nand a ",[55,134,135],{},"Unit Template"," for a specific building (both are required together).",[63,138,139],{},"Select the template(s) you want and confirm. Construvex creates one progress record per\nactivity in the template, ready to be updated.",[51,141,142],{},"Buildings that haven't been initialized yet, or that are missing a unit template, are flagged\nwith an attention banner on the phase progress page so nothing gets missed.",[144,145],"screenshot",{"id":146},"progress-tracking",[89,148,149],{},[51,150,151,154],{},[55,152,153],{},"Tip:"," Initialize buildings as soon as they're added to a phase, even before construction\nstarts. It's easier to track from day one than to backfill activity history later.",[46,156,158],{"id":157},"recording-progress","Recording progress",[51,160,161],{},"Once activities exist, update them from the phase or building progress page:",[60,163,164,191,197,203],{},[63,165,166,169,170,173,174,173,177,173,180,173,183,186,187,190],{},[55,167,168],{},"Status."," Activities move through six states as work happens on site: ",[55,171,172],{},"Not Started",", ",[55,175,176],{},"In\nProgress",[55,178,179],{},"Completed",[55,181,182],{},"Blocked",[55,184,185],{},"On Hold",", and ",[55,188,189],{},"N\u002FA"," for activities that don't apply.",[63,192,193,196],{},[55,194,195],{},"Evidence."," Some activities require photo evidence before they can be marked complete; you'll\nbe prompted to upload photos, with optional tags, at that point.",[63,198,199,202],{},[55,200,201],{},"Notes."," Add context to any status update.",[63,204,205,208],{},[55,206,207],{},"Bulk updates."," Select multiple activities at once, for example all activities on a floor, and\nupdate or mark them complete together.",[51,210,211],{},"Building progress pages offer a few ways to view and update activities depending on what you're\nlooking at: an overall summary, a detailed activity list, and a heatmap-style matrix. Buildings\ntracked floor by floor also get a floor-wise view with an elevation diagram, so you can see and\nupdate status floor by floor or unit by unit.",[46,213,215],{"id":214},"rera-progress-categories","RERA progress categories",[51,217,218],{},"Every activity belongs to one of RERA's standard construction categories, so your progress always\nmaps back to the categories authorities expect in compliance filings:",[220,221,222,235],"table",{},[223,224,225],"thead",{},[226,227,228,232],"tr",{},[229,230,231],"th",{},"Category",[229,233,234],{},"Covers",[236,237,238,247,255,263,271,279,287,295,303],"tbody",{},[226,239,240,244],{},[241,242,243],"td",{},"Excavation",[241,245,246],{},"Site preparation, excavation, and foundation groundwork",[226,248,249,252],{},[241,250,251],{},"Plinth",[241,253,254],{},"Plinth construction and ground-level work",[226,256,257,260],{},[241,258,259],{},"Stilt Floor",[241,261,262],{},"Stilt\u002Fparking floor structure and finishing",[226,264,265,268],{},[241,266,267],{},"Super Structure Slabs",[241,269,270],{},"Columns, beams, and floor slabs",[226,272,273,276],{},[241,274,275],{},"Internal Works",[241,277,278],{},"Internal walls, plaster, flooring, doors and windows within a unit",[226,280,281,284],{},[241,282,283],{},"Sanitary Fittings",[241,285,286],{},"Sanitary fittings within a unit",[226,288,289,292],{},[241,290,291],{},"Staircases, Lifts & Lobbies",[241,293,294],{},"Staircases, lift wells, lobbies, and water tanks",[226,296,297,300],{},[241,298,299],{},"External Works",[241,301,302],{},"External plumbing, external plaster, elevation, terraces",[226,304,305,308],{},[241,306,307],{},"Installation & Finishing",[241,309,310],{},"Lifts, pumps, fire-fighting, electrical, and final finishing",[51,312,313],{},"Each category shows its own percentage alongside the overall figure, so you can see, for\ninstance, that a building is fully done with excavation and plinth but still mid-way through\ninternal works.",[46,315,317],{"id":316},"how-progress-rolls-up-the-hierarchy","How progress rolls up the hierarchy",[319,320],"illustration",{"alt":321,"src":322},"Activity updates roll up into building progress, which rolls up into phase progress, with no re-entering of numbers","\u002Fillustrations\u002Fdocs-progress-rollup.svg",[51,324,325],{},"Progress recorded at the unit and building level aggregates automatically:",[60,327,328,333,338],{},[63,329,330,332],{},[55,331,120],{}," combines its building-scope activities with its units' progress for\ncategories that apply to both (internal works, for example), using a configurable weight per\ncategory that's split evenly between the two by default.",[63,334,335,337],{},[55,336,116],{}," combines the average of all buildings in the phase with phase-level\ninfrastructure progress, weighted so building work carries most of the weight and shared\ninfrastructure the rest.",[63,339,340],{},"The phase progress page shows the overall percentage, a per-building breakdown, and applicable\nRERA categories for each building, so you can drill from a phase-wide number down to the exact\nactivity holding a building back.",[51,342,343],{},"Percentages recalculate as activities are updated, so the numbers you see on any level are always\ncurrent as of the last update.",[46,345,347],{"id":346},"exporting-progress","Exporting progress",[51,349,350,351,355,356,359],{},"Phase and building progress pages can be exported directly from the page for sharing or offline\nreview. See ",[352,353,29],"a",{"href":354},".\u002Freports-and-exports",". For how progress connects to\nyour RERA categories and scope weights, see the ",[352,357,25],{"href":358},".\u002Frera-compliance-guide",".",{"title":361,"searchDepth":362,"depth":362,"links":363},"",2,[364,365,366,367,368,369],{"id":48,"depth":362,"text":49},{"id":99,"depth":362,"text":100},{"id":157,"depth":362,"text":158},{"id":214,"depth":362,"text":215},{"id":316,"depth":362,"text":317},{"id":346,"depth":362,"text":347},"Track real construction work, from setting up activities to seeing roll-up percentages at every level of the Project → Phase → Building → Unit hierarchy.","md",{},true,{"title":17,"description":370},"42q8BD2fkf3voXjM46fb6nNoIlYTVLpYqOvDAExKtFE",[377,379],{"title":13,"path":14,"stem":15,"description":378,"children":-1},"This guide walks through the day-to-day sales workflow in Construvex: finding or adding a customer, opening a deal on an available unit, moving that deal through its stages, and seeing how a booked unit hands off to its payment plan.",{"title":21,"path":22,"stem":23,"description":380,"children":-1},"Set up payment plans, generate a collection schedule when a unit is booked, and track what's been received against what's due.",1789206849162]